High Towers Rise from the Ground, Every Brick and Tile Reflects Craftsmanship — Written on the Completion of the Gastrointestinal Tumor Clinical Diagnosis and Treatment Center Project at Shanghai Ruijin Hospital
The Gastrointestinal Tumor Clinical Diagnosis and Treatment Center project at Ruijin Hospital is located in the heart of Shanghai, close to surrounding residential buildings. Shanghai Electric Power Construction was mainly responsible for the fabrication and installation of the steel structures for multiple individual buildings of the project, including the main building of the diagnosis and treatment center, the podium building, and the connecting corridors. The total construction area is 60,000 square meters, the building height is 99.8 meters, and the total steel structure volume is approximately 8,000 tons. "Building a livelihood project in a cramped space, the local Shanghai residents jokingly say we are 'performing a ritual in a snail's shell,'" said project manager Liu Ming with a laugh. "As soon as the project started, we faced a working environment with strict management, limited space, and difficult transportation, which brought considerable 'resistance' to our engineering work."
2024-11-25